IHC ConstructionMar 271 min readStart of Work - Des Plaines Structure CS-10 under Wolf/Rand intersection.IHC plans to set up Traffic control at the location on the week of April 1st. Excavation of the structure should be done by April 8th.Work inside the structure is planned to take a month.
IHC plans to set up Traffic control at the location on the week of April 1st. Excavation of the structure should be done by April 8th.Work inside the structure is planned to take a month.
CS-10 under Wolf RD - Completion of work.On 08/16/2024 all work at the location was completed and road was reopened.