top of page
IHC Construction

Start of Work - Des Plaines Structure CS-10 under Wolf/Rand intersection.

IHC plans to set up Traffic control at the location on the week of April 1st.

Excavation of the structure should be done by April 8th.

Work inside the structure is planned to take a month.



39 views0 comments

Recent Posts

See All

Comentários


bottom of page