IHC ConstructionSep 41 min readDS-8 - Start of work 08/06/2024IHC has begun work at structure DS-8 by Menards on Rand Rd Mt. Prospect. Work should be completed withing two months. Work includes removal of concrete top of the drop shaft and installation of new concrete top with structural steel and louvers.
IHC has begun work at structure DS-8 by Menards on Rand Rd Mt. Prospect. Work should be completed withing two months. Work includes removal of concrete top of the drop shaft and installation of new concrete top with structural steel and louvers.
CS-10 under Wolf RD - Completion of work.On 08/16/2024 all work at the location was completed and road was reopened.
CS-10 Des Plaines Intersection of Rand and Wolf RoadsDue to heavy rain, flow in the structure, delayed our scheduled completion of the work planned for 07/31/2024. Current completion with...